Home Magyarország
  Megoldások
Termékek
Támogatás - Szervíz
Magunkról
Kapcsolat   Magyarország
 
Megoldások  
 
Repüléstechnika (en)
 
 
Mezőgazdaság (en)
 
 
Erőforrások & Lehetőségek kezelése (en)
 
 
Autógyártás (en)
 
 
Építészet & Építőipar (en)
 
 
Kataszteri munkák (en)
 
 
Katasztrófa & Vészhelyzet Kezelés
 
 
Mérnöki munkák (en)
 
 
 Airports and Stadiums
 
 
 Bridges
 
 
 Harbours and Docks
 
 
 HDS Workflows
 
 
 Hydroelectric Power Plant
 
 
 Large Building Construction
 
 
 Plants & Refineries
 
 
  FPSO Vessel Conversion
 
 
  VECO Tyonek
 
 
  HDS3000 Increases Chevron Revenues
 
 
  Husky Refinery Upgrade
 
 
  BP Refinery uses HDS for Dimensional Control
 
 
  Construction QA for Lab
 
 
  Wind Power Plants
 
 
  Detailed pipe plan
 
 
  Paper Mill Retrofit
 
 
  Detroit Edison Power Plant
 
 
  Two-for-the-cost-of-one
 
 
  Rohm & Haas OSHA 1910
 
 
  Chevron Piping Revamp
 
 
  Off-shore Oil Platform
 
 
  First Cyrax retrofit project
 
 
 Railways
 
 
 Roads
 
 
 Sewage collection
 
 
 Sites
 
 
 Tunnel surveys
 
 
 Water Supplies
 
 
Kriminalisztika & Közbiztonság (en)
 
 
Általános Ipar (en)
 
 
Bányászat & Kutatás (en)
 
 
Monitoring (en)
 
 
Más egyéb (en)
 

Husky Refinery Upgrade

Husky Energy Refinery Revamp Project
"Laser Scanning Helps ProjEx Technologies Meet Tight Schedule," by Tom Greaves was published January 25, 2005 in Vol. 3, No. 4 of SparView. The article covers the Husky Refinery Upgrade that successfully used Bentley CloudWorx and PlantSpace software for efficeint revamp design verification.
Article Excerpt:

"Clean fuel initiatives primarily aimed at reducing sulfur are a cornerstone of this plan. The regulations require all refiners to produce a gasoline pool with a cumulative sulfur content of 30 parts per million by January 1, 2005. The diesel specifications call for an average of 15 parts per million by July 1, 2006.

Achieving these clean fuel targets requires revamping 40-year-old plus refining assets and infrastructure. Here's how ProjEx Technologies Ltd. in Calgary used laser scanning technology to minimize field rework and complete the design and installation of new rail and truck loading facilities within the client's compressed schedule. This project required the addition of significant infrastructure in and around the existing operating Husky Energy Refinery located in Prince George, British Columbia, Canada."

To read more of "Laser Scanning Helps ProjEx Technologies Meet Tight Schedule," click on the PDF icon below and download the SparView article (the article is also available on the Spar Point Research website):


 
 