Home Magyarország
  Megoldások
Termékek
Támogatás - Szervíz
Magunkról
Kapcsolat   Magyarország
 
Megoldások  
 
Repüléstechnika (en)
 
 
Mezőgazdaság (en)
 
 
Erőforrások & Lehetőségek kezelése (en)
 
 
Autógyártás (en)
 
 
Építészet & Építőipar (en)
 
 
Kataszteri munkák (en)
 
 
Katasztrófa & Vészhelyzet Kezelés
 
 
Mérnöki munkák (en)
 
 
Kriminalisztika & Közbiztonság (en)
 
 
Általános Ipar (en)
 
 
Bányászat & Kutatás (en)
 
 
Monitoring (en)
 
 
 Man-Made Structures
 
 
  Automated Deformation Monitoring Apollo Bridge, Bratislava, Slovakia
 
 
  Volume computation, Bonfol special waste
 
 
  Track Monitoring Traunstein, Germany
 
 
  Real Time GNSS Bridge Monitoring
 
 
  Monitoring of Rail Tracks and Construction Site
 
 
  First Monitoring Project in Slovenia
 
 
  Owen Street Level Crossing, Tipton
 
 
  Urban Excavation
 
 
  Rail bridge reconstruction
 
 
  Burj Dubai
 
 
  Al Hamra Tower
 
 
  Hong Kong Airport Express Line
 
 
  Jiangyin Bridge, China
 
 
  Northern Italian Reservoir
 
 
  GPS along the Danube
 
 
  Sydney Opera House
 
 
  Tsing Ma bridge - Hong Kong
 
 
  Yang-Pu bridge - Shanghai
 
 
  Akashi Strait suspension
 
 
  Vereina Tunnel - Switzerland
 
 
  Hornberg Reservoir
 
 
  Deformation monitoring
 
 
 Natural Phenomenons
 
 
Más egyéb (en)
 

Jiangyin Bridge, China

Bridge Monitoring with Leica GPS RTK technology
The Jiangyin Yangtze River Highway Bridge is the first super-large steel box-girder suspension bridge that spans more than one kilometer in China. It is the longest steel boxgirder suspension bridge in China, the fourth longest in the whole World. It services a superhighway which is the national key trunk
route crossing the Yangtze River. The Jiangyin Yangtze River Highway Bridge is the second suspension bridge that was constructed over the Yangtze River. It lies between Jiangyin and Jingjiang of Jiangsu Province, at the lower reaches of Yangtze River.
The upgrade and modification of the superstructure health monitoring system of Jiangyin Yangtze River Highway Bridge was completed using the Leica Geosystems' GPS monitoring system that focused on the monitoring of the girder geometric form and the displacement of the bridge towers. The challenge was to provide a cost effective and innovative solution for delivering 3D positioning information at 20 Hz from several GPS Monitoring stations to an advanced analysis application software developed by the engineering company in charge of the whole structural monitoring project.

 
 

kapcsolódó termékek

Leica GNSS Spider
Professzionális Üzleti Megoldások a GNSS Hálózatokhoz  részletek
Leica GRX1200 Series
High Performance GNSS Reference Receivers  részletek